Supporting a twelve-machine tree-work project

Supplying the machines was only one part of keeping a large project moving.

Operators in orange protective clothing working among several red spider lifts in woodland
Twelve machines and ten operators were supported throughout the tree-work project.Photo: Matt Dean

↳ The constraint

Keeping a multi-machine project on course

↳ The outcome

Weekly support, engineering cover and spare control cables kept the project moving.

This project involved twelve machines, ten operators and daily tree work. Weekly visits kept the survey, quotation and work on site connected from start to finish.

An engineer was available for breakdowns and spare control-box cables were kept ready. Staying close to the job meant small issues could be dealt with before they became delays.

Planning a difficult access job?

Turn the site constraints into a workable plan.

Send the route, working area and reach requirement. I’ll help you establish what needs checking next.

Tell me about the jobCall 07974 861939